...
Info |
---|
The Vessel Configuration Manager dialog is of type modal, which means that other functionality in Geocap is inactive until the dialog is closed by the OK or Cancel buttons. |
The Project part
The pulldown menu after the text Project contains a list of open projects in Geocap. Normally only one project is open, but in Geocap it is possible to have several projects open at the same time. Each project can have one or more vessel configurations. The selection of project decides the vessel configurations which will be shown in the vessel configurations part.
...
The right-click dialog in the Vessel configurations part.The
The Vessel configurations part
The Vessel configurations part shows the configurations for the actual project. If the project contains data from one multibram echosounder only, normally one configuration is necessary.
...
The Create copy entry is useful if it is necessary to "play" with the configuration parameters to see differences or improvements in the survey data when changing the settings.
The Survey lines part
The Survey lines part
When clicking the name of a vessel configuration above the corresponding survey lines are shown in the list.
...
Change the Vessel Configuration
The configuration parameters for a survey line can be changed in two ways, either by editing the parameters in the actual vessel configuration, or by replacing the configuration with another.
The Edit Vessel Configuration dialog
...